Leave a Message

Thank you for your message. We will be in touch with you shortly.

A New Summer in Gaslight Village: What Changed Around Reeds Lake This Year

A New Summer in Gaslight Village: What Changed Around Reeds Lake This Year

The Fourth of July celebration has already sent its fireworks over Reeds Lake, but the season around Gaslight Village is only settling into its full rhythm. The clearest change in 2026 is not one major opening or construction project. It is the way several smaller shifts now reinforce one another.

There are more places to stop along Wealthy Street, more Monday evenings with music at John Collins Park and active work on a trail connection near the east side of the lake. At the same time, some of the most discussed plans around Gaslight Village remain exactly that: plans.

That distinction matters. Here is the short version before we take a closer look:

Status in July 2026 What has changed
Open now Jyoti’s Kitchen, FP Movement and Molly’s Café & Deli have joined the Gaslight Village mix.
Happening this summer John Collins Park has a larger concert schedule, with movies and community events continuing into August and September.
Under construction The Reeds Lake Boulevard North Arm project includes a traffic circle, resurfacing and a new shared-use path connection.
Still being planned Waterfront Park Phase II, a potential joint parking design and the larger Gaslight Investors redevelopment are not completed projects.

New storefronts are changing the everyday routine

The most immediate changes are the ones residents can experience now.

Jyoti’s Kitchen opened at 2230 Wealthy Street SE in March, replacing Pink Piggy after about a month of renovations. Owner Jyoti Sharad brought the restaurant to Gaslight Village after operating a pickup-based supper club. The menu began with dishes such as vegetable pakoras, channa masala, butter chicken and saag paneer, along with vegetarian, vegan and gluten-free choices. Some of Pink Piggy’s boba offerings also remained available.

That transition adds a new dinner option without erasing every part of the previous business. It is a small example of how commercial turnover can add variety while retaining something familiar to regular customers.

A few doors away, Molly’s Café & Deli is spending its first full summer at 2213 Wealthy Street SE. The locally owned café opened in November 2025 with handmade sandwiches, salads and baked goods. Its dog-portrait wall adds an unusually local detail: customers can support the Humane Society through donations connected with portraits displayed in the café.

FP Movement is also operating at 2249 Wealthy Street, Suite 140. The approximately 2,400-square-foot specialty activewear store was announced for early 2026, and the brand’s official East Grand Rapids location page now lists regular store hours.

The owner of the existing retail development reported that FP Movement and Molly’s brought its ground-floor portfolio to full lease-up. That figure applies to the developer’s own retail space. It should not be read as a vacancy measurement for every storefront in Gaslight Village.

Even a familiar seasonal business had a different start this year. Winter damage delayed Jersey Junction’s expected March opening, but the ice cream shop reopened April 1. Its return continued a Gaslight Village tradition dating to 1963.

Taken together, these openings give residents more ways to combine a meal, an errand and time near the lake in one outing. That is more meaningful to daily neighborhood life than a single grand-opening announcement.

John Collins Park has more reasons to become a weekly habit

The expanded summer calendar is the second piece of the story.

East Grand Rapids increased its Concerts in the Park series to 10 Monday-evening performances in 2026, up from the usual six. The free shows run from 7 to 8:30 p.m. at John Collins Park. As of July 11, remaining concert dates are:

  • July 13
  • July 20
  • July 27
  • August 3
  • August 10
  • August 17

That increase matters because frequency changes behavior. Six concerts can feel like a set of special occasions. Ten dates make a Monday evening at the lake easier to treat as part of the summer routine.

Residents should review the city’s current concert schedule before heading out. The lineup has already received at least one update since its original May announcement.

Movies in the Park add another layer to the schedule. The remaining 2026 screenings are “Superman” on July 24, “Inside Out 2” on August 21 and “Remember the Titans” on September 19. Each movie begins at sundown, and the September date continues the fall movie-night format after its success last year.

The lakefront calendar also extends beyond evening entertainment:

  • The East Grand Rapids Farmers Market runs from 8:30 a.m. to 1 p.m. Thursdays through August 27 in the Community Center’s north parking lot. A Young Entrepreneurs table gives children, with adult supervision, an opportunity to sell child-made or child-driven goods.
  • Taste of East returns to Gaslight Village on Wednesday, August 19. It will again be paired with Rally on the Reeds after city meeting materials reported that the combined format worked well in 2025.

The practical shift is easy to see. Gaslight Village’s businesses and John Collins Park are functioning less like separate destinations and more like parts of the same neighborhood outing.

The Reeds Lake loop is improving, with a temporary tradeoff

The physical connection around the lake is also changing, although July brings some short-term inconvenience.

Construction on the Reeds Lake Boulevard North Arm began the week of July 6. According to the city’s current construction update, the project includes:

  • A new traffic circle
  • Resurfacing on the North Arm and part of Reeds Lake Boulevard
  • Storm-sewer work
  • A new shared-use path
  • Restoration and later tree planting

The path is designed to connect the Reeds Lake Trail with the newer sidewalk along Robinson Road and Cascade Road. The city anticipated completing the project near the end of July, subject to weather.

For now, residents should expect temporary routing changes. The posted detour uses Lakeside Drive, Robinson Road, Cascade Road, Manhattan Road and Reeds Lake Boulevard. Anyone planning a full trail loop should check the construction page before leaving.

Local rules for smaller electric devices also changed this year. In May, the city adopted updated standards for electric scooters, electric bikes and similar forms of transportation. Riders must yield to pedestrians on sidewalks and trails, and certain Gaslight Village sidewalks prohibit these devices. Riders younger than 18 must wear helmets on public roads, sidewalks and paths. The city’s micromobility update provides the fuller set of operating and parking requirements.

A separate Safe Routes to School package was approved in May. It includes planned work involving sidewalks, multiuse trails, crossings and accessibility, with Reeds Lake Boulevard among the studied areas. Those improvements have entered the funding and project process, but residents should not assume every component is finished this summer.

The larger point is that the connections between Gaslight Village, the trail and surrounding streets are receiving attention. The current construction is the visible part. Other approved work will take longer.

Some of the biggest changes are still on paper

Several major proposals can sound finished when discussed casually. They are not.

Waterfront Park Phase II

On July 6, the city posted a final conceptual plan for Waterfront Park Phase II after two rounds of public engagement. The proposed direction includes restored natural areas, accessible trails and boardwalks, overlook decks and an outdoor classroom. Other possible features include benches, bike racks, lighting, expanded parking and a toddler play area.

The plan gives residents a clearer picture of what may come next, but construction is tentatively scheduled for spring 2027. Detailed plans and bidding still need to occur. Anyone visiting Waterfront Park this summer should expect the existing park, not the proposed amenities shown in the concept.

The larger Gaslight redevelopment

The Gaslight Investors redevelopment also remains in the final-plan stage. The approved overall concept calls for six buildings, including residential and mixed-use buildings and a parking structure. It proposes 147 residential units and 493 parking spaces.

The first detailed phase presented in May covers three buildings with 40 residential units at 515 Lakeside Drive near Reeds Lake Boulevard. The difference between 40 and 147 is a matter of project scale: 40 applies to Phase One, while 147 applies to the full concept.

Questions and disagreement remain around scale, parking, traffic and open space, and the proposal is associated with pending litigation. No reliable current source confirms that every required final approval has been received or that construction has started. For now, the accurate description is proposed redevelopment under final-plan review.

Parking near Bagley Street

The city and East Grand Rapids Public Schools are studying a potential joint parking design near the high school and Bagley Street. Public sessions were scheduled for May 27, June 23 and July 22. The city describes the study as an early-stage effort to gather feedback before decisions are made.

These planning conversations matter because they may shape future access around Gaslight Village and Reeds Lake. They should not be confused with changes residents can use today.

What this summer says about Gaslight Village

Gaslight Village did not become a different place in 2026. The more useful observation is that its familiar pieces are working together more often.

New food and retail options support a stop on Wealthy Street. A larger John Collins Park calendar gives residents a reason to continue toward the lake. Trail work aims to improve a connection on the east side of Reeds Lake. Future park, parking and redevelopment plans show where the next round of change may occur, even though those plans are not finished.

For residents, the best way to understand this summer is simple: enjoy what is open, check current schedules and construction notices, and keep proposed projects in the correct category until approvals and timelines are confirmed.

Neighborhood changes can also prompt questions about how a property fits into the current local market. Ann Huizen brings decades of West Michigan experience and a consultative, relationship-first approach to those conversations. If you want a useful starting point without pressure, get your instant home valuation.

Work With Us

Looking to buy, sell, or invest in real estate? Whether you're a first-time buyer or an experienced investor, we're here to guide you every step of the way. Contact Ann today for expert advice and personalized service. Let's turn your real estate goals into reality!

Follow Me on Instagram